Can you add another storey with timber?

A new timber storey under construction above a two-storey brick industrial building

At Cherwell House in Oxford, a two-storey student residence gained two more floors. Timber Innovations built the new levels with timber-framed walls and prefabricated floor cassettes. At New Wave House in North London, a glulam frame added 495 m² of workspace above an existing industrial building. Both projects built upwards with timber, using different systems. Cherwell House, New Wave House.

Concept illustration of a timber rooftop extension.

A lighter structure can make a rooftop extension possible. Before you settle on a system or price the job, work through three questions.

1. Where will the extra weight go?

Start with a section through the building. If a proposed wall sits directly over an existing load-bearing wall, the route to the foundations may be fairly direct. Move that wall to suit the new layout and you might need a beam to carry the load across to an existing support. That can affect the floor depth, headroom and cost.

Ask the structural engineer to check how the loads travel through the existing walls, columns and foundations, and how the taller building will resist wind. Gather the original drawings and any records of later alterations if you have them. IStructE guidance on vertical extensions.

2. How will you get the timber onto the roof?

Mark the crane position on the site plan. How far does it have to reach to place the heaviest piece? Can the delivery vehicle get close enough, and is there space to unload?

Those answers can change what you order. A larger prefabricated panel can save assembly time on the roof if it can be delivered and lifted into place. On a tight site, smaller sections may be more practical, with more joints to assemble on the roof.

3. What keeps the floor below dry?

Look at the gap in the programme between opening the old roof and making the new one watertight. If the building stays occupied, that gap affects the people below as much as the crew above.

Agree how much roof to open at a time, where rainwater will drain and who checks the temporary protection at the end of the shift. What happens if the next lift is delayed and the opening has to stay covered over the weekend? TimbA’s guide to construction moisture planning.

Shop the range

Rothoblaas & Holz Technic timber screws

View all 28 products
Rothoblaas VGS · Fully threaded screw
50 per box
From £14.68ex VAT

5–7 days

Rothoblaas SNK · Countersunk timber screw
500 per box
From £4.99ex VAT

5–7 days

Rothoblaas TLL · Flange-head timber screw
In stock
100 per box
From £6.77ex VAT

Specifying timber on a live project?

Send us a drawing or sketch. We can help select suitable products and fixings. Where structural calculations or sign-off are needed, we can discuss the scope with our engineering partners. Delivery options are confirmed for the order.

Leave a comment