Timber vs Block: How long does it take to build a 3 bedroom house in the UK?
Timber vs Block: How long does it take to build a 3 bedroom house in the UK? IntroductionIf you are planning a new build, you may ask: how long does it take to build a 3 bedroom house in the UK? The answer often depends on the method. Timber frame can be much faster on site, while traditional block (masonry) is the old, trusted way but tends to take longer. This guide compares both, stage by stage, so you can plan a sensible timeline and budget. Quick answer: build time at a glance Timber frame: around 20–28 weeks (5–7 months) from breaking ground to move-in for a typical 3 bedroom house, assuming a well-run project and no long hold-ups. Block (masonry): around 28–40 weeks (7–10 months), sometimes up to 12 months with complex designs, slow trades, or heavy weather. Note: These ranges assume planning is already granted, designs are complete, materials and labour are booked, and utilities are not causing major delays. What “build time” means When people ask how long does it take to build a 3 bedroom house in the UK, they often mix pre-build steps with on-site work. Here, “build time” covers on-site programme from groundworks to completion. Pre-build steps like planning permission, design, and tendering can add 3–9 months before you start on site. Assumptions used in this comparison Standard 3 bedroom detached or semi-detached home, 90–120 m², simple form. Typical UK weather. Competent main contractor or tightly managed self-build. No unusual ground problems and no long utility delays. Standard spec (not ultra-bespoke). Why timber frame is faster Off-site manufacture: Walls and floors are made in a factory, so they arrive ready to assemble. Fast shell: A dry shell can be up in 1–2 weeks once the slab or foundations are ready. Early first fix: You can start services and internal finishes sooner because you reach “weathertight” quickly. Less drying time: Unlike wet plaster on blockwork, timber frame often uses plasterboard systems with lower moisture. Why block (masonry) takes longer Wet trades: Blockwork, render, and wet plaster need time to set and dry, slowing the sequence. Weather sensitivity: Heavy rain and cold snaps can delay block laying and external finishes. Longer to weathertight: Roof and windows often come later, which pushes back first fix. Typical stage-by-stage timelines Timber frame programme (indicative 20–28 weeks) Groundworks and foundations: 3–5 weeks Site set-up, strip foundations or slab, drainage runs. Timber frame delivery and erection: 1–2 weeks Crane lift, panels, floors, and roof structure. House becomes weathertight fast. Roof covering and windows/doors: 2–4 weeks Tiles/slates, membranes, fascia/soffits, glazing installed. First fix M&E (electrics, plumbing, heating): 2–3 weeks Runs are simple in pre-formed cavities. Insulation, vapour control, and boarding: 1–2 weeks Plastering/taping and jointing: 1–2 weeks External finishes: 2–4 weeks Cladding, render, or brick slip facing if used, plus gutters. Second fix and joinery: 2–3 weeks Kitchen, internal doors, skirting, sockets, radiators. Decoration and finishes: 2–3 weeks Painting, flooring, tiling. Testing, commissioning, and snagging: 1–2 weeks Building control sign-off, EPC, handover. Block (masonry) programme (indicative 28–40 weeks) Groundworks and foundations: 3–6 weeks Often similar to timber frame, but slower if site access is tight. Masonry superstructure: 6–10 weeks Blockwork to ground and first floor, lintels, structural steel where needed. Roof structure and covering: 3–5 weeks Trusses, felt, battens, tiles/slates. Windows and doors: 2–4 weeks Weathertight after installation. First fix M&E: 2–3 weeks Internal plastering (wet trades): 3–4 weeks Longer drying times before decorating. External finishes (render/brick): 3–6 weeks Dependent on weather and scaffold turnaround. Second fix and joinery: 3–4 weeks Decoration and finishes: 2–3 weeks Testing, commissioning, and snagging: 1–2 weeks Key factors that change how long does it take to build a 3 bedroom house in the UK Design complexity: Complex shapes, rooflines, and details add weeks. Weather: Masonry is more sensitive to cold and wet. Timber frame reduces this risk by getting weathertight faster. Lead times: Timber frame needs early design lock-in and factory slot booking. Windows, heat pumps, and bespoke kitchens can delay both methods. Labour availability: A well-planned, well-staffed site keeps momentum. Shortages cause gaps between stages. Inspections and sign-offs: Building control, warranty providers, and utility firms can hold up progress if not booked ahead. Drying time: Masonry wet trades can push back decoration and flooring. Client changes: Late changes to layout or spec add delay to both methods, often more so with timber once the frame is fixed. Cost and quality notes linked to time Timber frame Often lower prelims (site overheads) due to shorter programme. Good thermal performance and airtightness with less time on site. Needs early design decisions. Changes later can be costly. Block (masonry) Familiar to many builders; easier to tweak details on site. Longer programme can mean higher prelims. More drying time; careful scheduling needed to avoid moisture issues in finishes. Simple example schedules you can adapt Example: Timber frame 24-week schedule Weeks 1–4: Groundworks, slab, drainage Weeks 5–6: Timber frame up, roof structure Weeks 7–8: Roof covering, windows/doors; weathertight Weeks 9–10: First fix M&E Weeks 11–12: Insulation and boarding Weeks 13–14: Plastering/taping Weeks 15–18: External finishes and cladding/render Weeks 19–21: Second fix and joinery Weeks 22–23: Decoration and flooring Week 24: Testing, commissioning, snagging Example: Block (masonry) 34-week schedule Weeks 1–5: Groundworks and foundations Weeks 6–14: Masonry superstructure and roof structure Weeks 15–17: Roof covering and windows/doors; weathertight Weeks 18–20: First fix M&E Weeks 21–24: Plastering (wet trades) and drying Weeks 25–29: External finishes (render/brick) and scaffold down Weeks 30–32: Second fix and joinery Weeks 33–34: Decoration, flooring, testing, snagging FAQs: how long does it take to build a 3 bedroom house in the UK? Can timber frame be built in winter? Yes. Once the frame is up and the shell is weathertight, internal work can proceed with fewer weather delays than masonry. Does faster always mean cheaper? Not always, but shorter programmes can reduce prelims and finance costs. Total cost still depends on spec, location, and contractor rates. Do lenders and insurers accept timber frame? Most mainstream lenders and
Timber vs Block: How long does it take to build a 3 bedroom house in the UK? Read More »