TimbA Systems Team

Timber vs Block: How long does it take to build a 3 bedroom house in the UK?

Timber vs Block: How long does it take to build a 3 bedroom house in the UK? IntroductionIf you are planning a new build, you may ask: how long does it take to build a 3 bedroom house in the UK? The answer often depends on the method. Timber frame can be much faster on site, while traditional block (masonry) is the old, trusted way but tends to take longer. This guide compares both, stage by stage, so you can plan a sensible timeline and budget. Quick answer: build time at a glance Timber frame: around 20–28 weeks (5–7 months) from breaking ground to move-in for a typical 3 bedroom house, assuming a well-run project and no long hold-ups. Block (masonry): around 28–40 weeks (7–10 months), sometimes up to 12 months with complex designs, slow trades, or heavy weather. Note: These ranges assume planning is already granted, designs are complete, materials and labour are booked, and utilities are not causing major delays. What “build time” means When people ask how long does it take to build a 3 bedroom house in the UK, they often mix pre-build steps with on-site work. Here, “build time” covers on-site programme from groundworks to completion. Pre-build steps like planning permission, design, and tendering can add 3–9 months before you start on site. Assumptions used in this comparison Standard 3 bedroom detached or semi-detached home, 90–120 m², simple form. Typical UK weather. Competent main contractor or tightly managed self-build. No unusual ground problems and no long utility delays. Standard spec (not ultra-bespoke). Why timber frame is faster Off-site manufacture: Walls and floors are made in a factory, so they arrive ready to assemble. Fast shell: A dry shell can be up in 1–2 weeks once the slab or foundations are ready. Early first fix: You can start services and internal finishes sooner because you reach “weathertight” quickly. Less drying time: Unlike wet plaster on blockwork, timber frame often uses plasterboard systems with lower moisture. Why block (masonry) takes longer Wet trades: Blockwork, render, and wet plaster need time to set and dry, slowing the sequence. Weather sensitivity: Heavy rain and cold snaps can delay block laying and external finishes. Longer to weathertight: Roof and windows often come later, which pushes back first fix. Typical stage-by-stage timelines Timber frame programme (indicative 20–28 weeks) Groundworks and foundations: 3–5 weeks Site set-up, strip foundations or slab, drainage runs. Timber frame delivery and erection: 1–2 weeks Crane lift, panels, floors, and roof structure. House becomes weathertight fast. Roof covering and windows/doors: 2–4 weeks Tiles/slates, membranes, fascia/soffits, glazing installed. First fix M&E (electrics, plumbing, heating): 2–3 weeks Runs are simple in pre-formed cavities. Insulation, vapour control, and boarding: 1–2 weeks Plastering/taping and jointing: 1–2 weeks External finishes: 2–4 weeks Cladding, render, or brick slip facing if used, plus gutters. Second fix and joinery: 2–3 weeks Kitchen, internal doors, skirting, sockets, radiators. Decoration and finishes: 2–3 weeks Painting, flooring, tiling. Testing, commissioning, and snagging: 1–2 weeks Building control sign-off, EPC, handover. Block (masonry) programme (indicative 28–40 weeks) Groundworks and foundations: 3–6 weeks Often similar to timber frame, but slower if site access is tight. Masonry superstructure: 6–10 weeks Blockwork to ground and first floor, lintels, structural steel where needed. Roof structure and covering: 3–5 weeks Trusses, felt, battens, tiles/slates. Windows and doors: 2–4 weeks Weathertight after installation. First fix M&E: 2–3 weeks Internal plastering (wet trades): 3–4 weeks Longer drying times before decorating. External finishes (render/brick): 3–6 weeks Dependent on weather and scaffold turnaround. Second fix and joinery: 3–4 weeks Decoration and finishes: 2–3 weeks Testing, commissioning, and snagging: 1–2 weeks Key factors that change how long does it take to build a 3 bedroom house in the UK Design complexity: Complex shapes, rooflines, and details add weeks. Weather: Masonry is more sensitive to cold and wet. Timber frame reduces this risk by getting weathertight faster. Lead times: Timber frame needs early design lock-in and factory slot booking. Windows, heat pumps, and bespoke kitchens can delay both methods. Labour availability: A well-planned, well-staffed site keeps momentum. Shortages cause gaps between stages. Inspections and sign-offs: Building control, warranty providers, and utility firms can hold up progress if not booked ahead. Drying time: Masonry wet trades can push back decoration and flooring. Client changes: Late changes to layout or spec add delay to both methods, often more so with timber once the frame is fixed. Cost and quality notes linked to time Timber frame Often lower prelims (site overheads) due to shorter programme. Good thermal performance and airtightness with less time on site. Needs early design decisions. Changes later can be costly. Block (masonry) Familiar to many builders; easier to tweak details on site. Longer programme can mean higher prelims. More drying time; careful scheduling needed to avoid moisture issues in finishes. Simple example schedules you can adapt Example: Timber frame 24-week schedule Weeks 1–4: Groundworks, slab, drainage Weeks 5–6: Timber frame up, roof structure Weeks 7–8: Roof covering, windows/doors; weathertight Weeks 9–10: First fix M&E Weeks 11–12: Insulation and boarding Weeks 13–14: Plastering/taping Weeks 15–18: External finishes and cladding/render Weeks 19–21: Second fix and joinery Weeks 22–23: Decoration and flooring Week 24: Testing, commissioning, snagging Example: Block (masonry) 34-week schedule Weeks 1–5: Groundworks and foundations Weeks 6–14: Masonry superstructure and roof structure Weeks 15–17: Roof covering and windows/doors; weathertight Weeks 18–20: First fix M&E Weeks 21–24: Plastering (wet trades) and drying Weeks 25–29: External finishes (render/brick) and scaffold down Weeks 30–32: Second fix and joinery Weeks 33–34: Decoration, flooring, testing, snagging FAQs: how long does it take to build a 3 bedroom house in the UK? Can timber frame be built in winter? Yes. Once the frame is up and the shell is weathertight, internal work can proceed with fewer weather delays than masonry. Does faster always mean cheaper? Not always, but shorter programmes can reduce prelims and finance costs. Total cost still depends on spec, location, and contractor rates. Do lenders and insurers accept timber frame? Most mainstream lenders and

Timber vs Block: How long does it take to build a 3 bedroom house in the UK? Read More »

Mass timber in the UK: a practical guide for developers and architects

Above: Dalston Lane is the largest cross-laminated timber building built to date (image courtesy of Daniel Shearin). Mass timber in the UK: a practical guide for developers and architects Mass timber has moved from niche to mainstream conversation in UK construction. Developers want faster, cleaner builds with strong returns. Architects want low‑carbon structures with warm, human spaces. Mass timber can deliver both when used in the right way, on the right sites, with the right team. This guide gives a clear, practical overview for UK projects aimed at feasibility and early design decisions. What is mass timber and where it fits Mass timber refers to engineered wood products such as cross‑laminated timber (CLT), glue‑laminated timber (glulam), laminated veneer lumber (LVL), and dowel‑laminated timber (DLT). Panels and beams are factory‑made to tight tolerances and arrive ready to assemble. In the UK, the sweet spot has been mid‑rise residential and office buildings, schools, and hybrid extensions. You can also see mass timber used as floors and roofs over a steel or concrete core, or as a full structural frame on suitable schemes. The core value is clear. You get lower embodied carbon than conventional frames, fast and quiet installation, lighter foundations, and healthy interiors. The challenge is equally clear. You must resolve fire performance, acoustic separation, moisture protection, insurance acceptance, procurement timing, and robust detailing. The UK regulatory picture (what to know early) The UK does not prohibit mass timber, but it does require evidence‑based design and careful compliance. Design teams should align early with: Building Regulations and Approved Documents, especially fire safety guidance, structural requirements, and acoustic performance. Eurocode 5 and related standards for timber design, including fire design methods for charring and protection. Local authority expectations, often including a fire statement and a whole‑life carbon assessment for larger schemes. The most effective projects bring a fire engineer into RIBA Stage 1–2, agree a route to compliance, and document it. Expect discussion on structural redundancy, protected escape routes, cavity barriers, encapsulation strategy, and staged fire scenarios during construction and in use. Sound insulation and impact noise also need early attention, especially for residential. If your project is in London or another progressive authority, plan to show embodied carbon calculations and a clear circularity strategy. This plays well with planners, investors, and occupiers. Benefits that move the needle for developers For developers, the main questions are risk, speed, cost, and exit. Mass timber can support a stronger business case by combining programme gains and market appeal. Programme and prelims. Prefabrication shortens time on site and reduces wet trades. Fewer deliveries, cleaner sequencing, and early dry‑in can cut prelims and neighbourhood disruption. Faster completion can bring revenue forward and reduce finance costs. Foundation savings. A lighter frame means smaller foundations or less ground improvement on challenging sites. This can unlock plots that would be marginal with heavier structures. Letting and sales. Timber interiors feel warm and natural. This can boost net effective rents or sales values, and help with pre‑lets in the office market where ESG and wellbeing matter. Occupiers increasingly ask for low‑carbon fit‑outs and healthy materials. Planning and ESG. A credible low‑carbon story helps win support from planners and communities. It also aligns with investor pressure on whole‑life carbon and climate risk. Key design considerations for architects Grid and spans. Choose a rational grid that suits panel sizes, transport limits, and crane capacity. Keep a tight family of structural depths so services can pass and ceilings remain clean. Acoustics. Plan acoustic build‑ups from day one. Think about separating floors, flanking paths, and junctions. Dry systems with toppings, resilient layers, and smart connection details can work well without losing height. Fire strategy. Decide when and where to expose timber and when to encapsulate it. Use tested build‑ups. Consider charring allowances, sacrificial layers, and compartmentation. Coordinate penetrations, cavities, and interfaces. Moisture. Protect the frame during transport and erection. Plan temporary weather protection, early roof, and façade sequencing. Use sensors if helpful. Detail for drying and avoid hidden traps. Services and coordination. Pre‑plan routes, penetrations, and connection zones. A little BIM effort early avoids site clashes later. Keep repeatable details and standardised nodes. Heritage and extensions. Timber is often ideal for rooftop or rear extensions due to weight limits, speed, and low disruption to neighbours. Cost and procurement: how to reach cost confidence Upfront cost can be similar to, slightly above, or below steel or concrete depending on market timing, project type, and design choices. What often tips the balance is total project cost and time. The best way to get certainty is: Early supplier input. Engage a mass timber fabricator or specialist at concept or early developed design to confirm panel sizes, connection systems, tolerances, and erection methodology. Comparable options. Cost plan a steel or concrete alternative alongside timber. Include prelims, programme, MEP coordination, fire protection, acoustic build‑ups, and façade interfaces in a like‑for‑like comparison. Logistics plan. Confirm crane strategy, delivery windows, laydown space, site access, and protection measures. This reduces risk allowances in bids. Lead times for European CLT and glulam are manageable but can vary. Lock in capacity early and avoid bespoke elements that break factory efficiency. Hybrid frames can also be a smart route to balance cost, risk, and performance. Insurance and approvals: de‑risk the conversation Insurers want clarity on ignition risk, fire spread, suppression, and resilience. Provide a simple pack that covers the fire strategy, façade design, cavity barriers, sprinkler decisions, protection of structural timber, and construction phase controls. Include reference projects with similar exposure and use class. Some clients choose partial encapsulation in selected areas to smooth insurer approval without losing exposed timber in key spaces. For warranty providers and funders, share test evidence for build‑ups, acoustic results, and moisture management. A clear commissioning and maintenance plan helps. Supply chain and sustainability Most CLT and glulam used in the UK comes from well‑established European mills with FSC or PEFC certification. UK supply is growing, but capacity and product ranges are still limited compared to mainland Europe. For

Mass timber in the UK: a practical guide for developers and architects Read More »

Shopping Cart
Scroll to Top